The attic...installing the plexiglass safety over the occulus.  All fixtures are installed and the floor is pretty much done.



The playroom...lighting and electric fixtures installed...pretty much done.



Same with Gabriella's room..


And Tyler's...

 

Laundry room...washer/dryer is there and is awaiting installation.  We just need some millwork and countertops there and we're done.


4th floor hallway...pretty much done.



Library...


Push button light switches with faceplates to match the finishes in the room...

More library...


Third floor hallway...


Master bedroom...


2nd floor hallway (powder room in the background)



Appliances arrived...money shot #1...the range/stove


Money shot #2..the refrigerator



#3...wine fridge, dishwasher, microwave

Final coats of paint in the parlor...just need to put finishing coats of poly on the floor (can't do that until the kitchen is finished and we have the appliances installed)



Kitchen...lights are in and just need to have countertops installed, floors finished, appliances installed, finish plumbing, and the cove tine moulding installed.




Powder room plumbing installed...



Rental appliances also arrived...


As did the boiler in time for the fall...