Wednesday, December 16, 2009

Ok. We've finally done a respectable amount of unpacking, cleaning, and even managed to host 8 people over for dinner, so thought it would be appropriate to update the blog.

So, the rental is done but for small punch list items and the tenant is all moved in.  We managed to take a few snapshots of the finished space.  In rapid fire sequence...

Living room and kitchen...



The bathroom and hallway...





The master bedroom...


On to the main house.  This week we are showing photos of the parlor floor and the library.  The Karp household usually doesn't look this festive but Melinda was preparing and decorating for a holiday dinner party for 10.  Her transformation into s Stepford wife is almost complete.

The living room...







Dining Room




Kitchen



Entrway and Hallway




Library








Outside


Tune back in a week or two for more...

Thursday, December 3, 2009

We're trying, honest!

We know our three fans are eagerly anticipating updates and pictures...we are trying to get them up but are finding that every spare minute is spent swiffering the floor instead of unpacking or photographing. But they're coming soon, we promise.

In the meantime, we thought we'd give you a teensy taste of what's to come. Below is a picture taken in our new kitchen, of our wonderful Thanksgiving turkey. The holiday may still be over, but we at the Karp Mahal are still very, very thankful.


Sunday, November 22, 2009

Posting from beneath an inch of dust...

We know the loyal followers of the Karp Mahal are clamoring for updated photos of how we are living in the space.  We promise to document and share, just give us some time as we get our bearings in the house and attempt to not photograph the absolute pig sty that it currently resembles.

The kids floor looks good and, but for no place to put our coats right now as well as not having any artwork up on the wall, the parlor floor looks pretty good too.  The master bedroom is a disaster - particularly Melinda's closet - but the master bathroom is fine.  The library is a repository for all things we can't get around to organizing and the attic is just too many flights of stairs to get to.

Decent progress in the rental as well.

Happy Thanksgiving to all and check back after the holiday for an update.  We at the Karp household have much to be thankful for.

Wednesday, November 11, 2009

Out with the old, in with the new

Hi, everyone. Melinda, here. I just wanted to give a quick update, since we are likely to be without internet for a while. The move is scheduled for tomorrow...despite a slight boiler issue that has left our engineer at the top of our "do we really have to pay this idiot?" list and a punchlist that is a little too long for our liking. Regardless, the truck is coming and by tomorrow night, we will be residents of the Karp Mahal.

Once our internet is running again, Matt will be back with more pictures than you can stomach, I'm sure. But I wanted to take the chance to give credit where credit is due:

Though my husband has used the term "we" on the blog, the lion's share of the work--from the design to the paint selection to the organzation to the yelling at the contractor to the trips to Home Depot--has been done by him. It's really been Matt's project and he has done an amazing job. It's been a real labor of love and he deserves all the credit. The kids and I couldn't be more excited to move into our new house...and to have Daddy around on the weekends again :)

Monday, November 9, 2009

Progress - Week of November 2

Getting down to true punchlist items...

Not a lot of pictures of the upper 3 floors as most of the space hasn't changed.  A lot of transformation on the parlor floor as well as the front door.

Starting on the 4th floor...Gabriella's room finshed...even the fireplace cast iron has been painted.




Plumbing fixtures installed and we're good to go in the kid's bathroom



Just need to connect the exhuast for the dryer and Melinda is in laundry nirvana.



Stairs on the upper floors are done.  We will install a runner once construction is completed.



Third floor hallway...



Onto the second floor...the parlor...interior wood doors and casings have been stained and sealed.  Just need a last coat of poly on the parlor floor as well as the kitchen/dining room floor.








The kitchen...






The walnut countertops are finally exposed...


Shot from the kitchen looking out to the dining room and the parlor beyond the pocket doors.



And Matt's nirvana...



The double exterior doors and the vestibule.  Hardware should be installed any hour...




The parlor level hallway from looking towards the front of the house.  Much appreciation to the expediter for botching my filing and providing restitution in the form of a new marble floor.



The hallway from the front looking back towards the powder room and up the stairs...



Exterior shot of the front door...looks much better in stain than in paint...



Our new (although it doesn't look very new) Bilco-style door to the cellar.  This sub-contractor gets the award for dipshit of the week since he hasn't finished the rear exterior staircase leading from the kitchen out to the garden in the back.



Check back next week as we document the move-in and show progress on the rental...

Monday, November 2, 2009

Progress - Week of October 26

Given a lack of noticeable progress over the past week, there are no photos chronicling the work which theoretically took place.

Be sure to check back next week to see either (A) the house nearing completion or (B) Matt's arraignment in criminal court following the homicide of the general contractor.

Monday, October 26, 2009

Progress - Week of October 19

Be prepared for some photos...hope the wait has been worth it.


The attic...installing the plexiglass safety over the occulus.  All fixtures are installed and the floor is pretty much done.



The playroom...lighting and electric fixtures installed...pretty much done.



Same with Gabriella's room..


And Tyler's...

 

Laundry room...washer/dryer is there and is awaiting installation.  We just need some millwork and countertops there and we're done.


4th floor hallway...pretty much done.



Library...


Push button light switches with faceplates to match the finishes in the room...

More library...


Third floor hallway...


Master bedroom...


2nd floor hallway (powder room in the background)



Appliances arrived...money shot #1...the range/stove


Money shot #2..the refrigerator



#3...wine fridge, dishwasher, microwave

Final coats of paint in the parlor...just need to put finishing coats of poly on the floor (can't do that until the kitchen is finished and we have the appliances installed)



Kitchen...lights are in and just need to have countertops installed, floors finished, appliances installed, finish plumbing, and the cove tine moulding installed.




Powder room plumbing installed...



Rental appliances also arrived...


As did the boiler in time for the fall...


Hope to have some good progress to show next week but Matt is feeling anxious that nothing will get done.